The Ultimate Guide to PI Planning

Contents
This is some text inside of a div block.
This is some text inside of a div block.
This is some text inside of a div block.
Subscribe to our newsletter

You may be just starting out, or you may have worked with agile methodologies for a while, but we’re sure you can agree that scaling agile in a large organization can be daunting. PI Planning is key to scaling agile, so we’ve developed this guide to help you run successful planning sessions, and build your confidence for your next scaled planning event.

We'll cover:

Let’s start with the basics…

What is PI Planning?

PI Planning stands for Program Increment Planning.

PI Planning sessions are regularly scheduled events where teams within the same Agile Release Train (ART) meet to align and agree on what comes next. Teams will aim to align on goals and priorities, discuss features, plan the roadmap, and identify cross-team dependencies.

The goal is to align the teams to the mission and each other. Here are the essential elements of PI Planning:

  • 2 full day events run every 8-12 weeks (depending on the length of your increments)
  • Product Managers work to prioritize the planned features for the increment beforehand
  • Development teams own user story planning and estimation
  • Engineers and UX teams work to validate the planning

Why do PI Planning?

PI Planning is incredibly beneficial for large-scale agile organizations. PI Planning enables:

  • Communication
  • Visibility
  • Collaboration

To understand the impact, let’s look at an example of a large organization that hasn’t yet implemented PI Planning. This organization has 250 teams and 6,500 team members. These teams rarely speak to each other, outside of dealing with a critical issue that has forced them to collaborate.

Alignment across these teams happens at the leadership team level, and they have multiple levels of managers in between who cascade information down with varying success. There is a constant battle for resources, budget, and opportunities to work on the most exciting projects.

Their projects have a habit of conflicting - one team would release something and then it would break something in another team’s project.

PI Planning is the first time many big companies get their teams together in a room or on the same call to talk to each other. This is a chance to have important conversations about who is working on what.

Why is this important?

  1. When you’re touching a system or a code repository, you need to know how it’s going to impact another team
  2. You might need to do some work to enable another team to work on their feature first (and vice versa)

With proper planning and collaboration, teams can get things done more effectively, release with more predictability, and stay on budget.

All very good reasons to do PI Planning.

What is the goal of PI Planning?

PI Planning is an essential part of the Scaled Agile Framework, a framework that’s designed to bring agile to large companies with multiple teams.

SAFe PI Planning helps teams in the Agile Release Train (ART) synchronize, collaborate, and align on workflows, objectives, releases, and more.

Without PI Planning, teams don’t have structured communication. They may not know what the other teams are working on, which can cause a lot of problems. For example, two teams might be working on different features without realizing there’s a dependency, which could hold up the release or require a significant rework of the code.

The goal of PI Planning is to have all your teams aligned strategically and enable cross-team collaboration to avoid these potential problems.

Now that we’ve covered off the “why”, let’s dig a bit deeper into the “what”. The best way to get a picture of what happens during PI Planning is to take a look at an agenda.

What should be included in the PI Planning agenda?

Here’s a standard PI Planning agenda template:

Day 1 AgendaDay 2 Agenda8:00 - 9:00 | Business Context8:00 - 9:00 | Planning Adjustments9:00 - 10:30 | Product/Solution Vision9:00 - 11:00 | Team Breakouts10:30 - 11:30 | Architecture Vision and Development Practices11:00 - 13:00 | Final Plan Review and Lunch11:30 - 13:00 | Planning Context and Lunch13:00 - 14:00 | ART Risks13:00 - 16:00 | Team Breakouts14:00 - 14:15 | Confidence Vote16:00 - 17:00 | Draft Plan Review14:15 - ??  |Plan Rework?17:00 - 18:00 | Management Review and Problem Solving?? | Planning Retrospective and Moving Forward

Source: scaledagileframework.com/pi-planning

This agenda might be perfect for you, or you might make changes based on the needs of your teams.

Distributed teams, very large ARTs, and other factors might require you to be creative with the schedule. Some sessions may need more time, while others can be shortened. If you have teams in multiple time zones, your PI Planning agenda may need to go over 3-4 days. If it’s your first PI Planning event, try the standard agenda, get feedback from your teams, and experiment with different formats next time.

What happens in the first part of the PI Planning meeting?

The first part of the PI Planning meeting is designed to set the context for the planning that happen next.

Day 1 usually kicks off with a presentation from a Senior Executive or Business Owner. The agenda allows an hour to talk about the current state of the business. They highlight specific customer needs, how the current products address these needs, and potential gaps.

After that, the Product Management team will share the current vision for your product or solution. They’ll talk about any changes that have occurred since the last PI Planning session (usually around 3 months prior). They’ll describe what’s coming up, including milestones and the next 10 features that are planned. This session should take around 1.5 hours.

Why is a confidence vote held at the end of PI Planning?

The confidence vote is a seemingly small but very important part of PI Planning towards the end of the event.

It is important the team is confident in committing to the objectives and work that is planned. The Release Train Engineer will ask teams to vote on this.

Everyone participating in planning needs to vote. This could be via a raise of hands (and fingers) or it could be via the tool you’re using. For example, the Team Planning board in Easy Agile Programs allows each team member to enter their confidence vote.

If the average vote across the room is at least three out of five, the plan is a go-ahead. If it’s less it’ll need reworking (until it reaches a high confidence level). If anyone votes just one or two, they’ll have the chance to share their reasoning.

The confidence vote is all about making sure that the attendees are in alignment and that they agree that the plan in its current form is possible within the given timeframe. Speaking of timing, let’s talk about how and where PI Planning actually fits into your company calendar.

When is PI Planning held?

Many companies find that 8-12 weeks (which adds up to 4-6 x 2-week iterations) is the right amount of time for an increment.

Some companies hold quarterly PI Planning, for example:

  • Q1 PI Planning: December
  • Q2 PI Planning: March
  • Q3 PI Planning: June
  • Q4 PI Planning: September

However, the timing and frequency will depend on how long each program increment is scheduled to last and may need to accommodate holidays.

The good thing about PI Planning events is that they happen regularly on a fixed schedule, which means you can plan for them well ahead of time. That means teams and Business Owners have plenty of notice to ensure they can show up for the event.

This means that what happens in preparation for PI Planning can be just as important as the event itself.

What is a pre-PI Planning event and when is it needed?

A pre-planning event - separate to PI Planning - is to make sure that the ART is aligned within the broader Solution Train before they do PI Planning. It’s all about synchronizing with the other ARTs to ensure the solution and organization are heading in the right direction, together.

You’ll need to organize a pre-PI Planning event if you’re operating at the Large Solution, Portfolio, or Full SAFe levels. Essential SAFe is more basic and does not have a Solution Train, so if you’re operating at this level, you won’t need pre-PI Planning so formally.

Here are a few of the roles that should be invited to the pre-planning event:

  • Solution Train Engineer
  • Solution Management
  • Solution Architect/Engineering
  • Solution System Team
  • Release Train Engineers
  • Product Management
  • System Architects/Engineers
  • Customers

They’ll look at the top capabilities from the Solution Backlog, Solution Intent, Vision, and Solution Roadmap. It’s really a lot like PI Planning but at a higher level, across the overall solution and not just the individual ART.

The event starts with each ART summing up their previous program increment and accomplishments to set the context. Next, a senior executive will brief the attendees on the current situation before Solution Management discusses the current solution vision and any changes from what was shared previously. Other things that are often discussed or finalized include:

  • Roadmaps
  • Milestones
  • Solution backlogs
  • Upcoming PI features from the Program Backlog

In the next section, we'll help to define a few key terms that have been touched on.

PI Planning in SAFe

If you’re adopting SAFe for the first time, chances are it will start with PI Planning. That’s because it forms the foundation of the Scaled Agile Framework.

As Scaled Agile says, "if you are not doing it, you are not doing SAFe."

Definition:

SAFe or the Scaled Agile Framework™ is a series of guidelines and practices designed to help bring agility into larger organizations, across all teams and levels of the business. The framework is geared at improving visibility, alignment, and collaboration and should lead to greater productivity, better results, and faster delivery.

Whether you’re adopting all 5 levels or just essential SAFe, the foundation of your transformation and the driver for everything is the PI Planning ceremony.

Scrum and Kanban are also agile frameworks (that you may be more familiar with), and these have historically been very effective at the individual team level. SAFe helps to scale agility across teams; to have multiple teams come together to work on the same products, objectives, and outcomes. It goes beyond the team level to include every stakeholder, outlining what should happen at each level of the organization to ensure that scaled planning is successful.

The purpose of SAFe is to improve the visibility of work and alignment across teams, which will lead to more predictable business results.

This is increasingly important for organizations as they respond to changing circumstances and customer expectations. The traditional waterfall approaches fall short because they’re slow and inefficient.

Bigger companies (often with thousands of developers) can’t keep up with the innovation of smaller, more nimble startups. Along with bigger teams, larger organizations often have stricter requirements around governance and compliance, making it more complex to launch a new feature and deliver new value to customers.

These companies are looking for new ways to organize people into projects and introduce more effective ways of working that use resources more effectively and provide more predictable delivery. If they don’t, they may not survive.

SAFe is a way for these companies to start moving in a more agile direction.

PI Planning is a vital element of SAFe. It’s a ceremony that brings together representatives from every team to help them work together, decide on top features to work on next, identify dependencies, and make a plan for the next Program Increment. As a result, there’s greater visibility across all the teams, changes are made more frequently, and teams work with each other - not against each other. From there, these massive companies can speed up their processes, work more efficiently, compete with newer and more nimble companies, and stay viable.

SAFe and PI Planning are powerful enablers for organizational agility.

While SAFe is a framework designed for larger organizations, there isn't a reason stopping smaller companies from doing a version of PI Planning, too. All you need is more than one agile team to make it worthwhile.

PI Planning in Scrum

You can also use PI Planning as part of a simple Scrum approach.

Scrum Framework diagram shows when and how scrum teams can implement PI Planning

Scrum Framework diagram shows when and how scrum teams can implement PI Planning

Source: Scrum.org

Scrum is an agile framework that helps teams get things done. It’s a way for teams to plan and organize their own work and tackle user stories and tasks in smaller time boxes. This is often referred to as a sprint.

If multiple scrum teams want to work better together (but aren’t necessarily operating within SAFe), they could adopt a version of PI Planning.

For example, these scrum teams could:

  • Meet every 10 weeks and discuss the features they are planning to work on
  • Get product managers to combine backlogs and prioritize together
  • Share resources across the teams, as needed
  • Map dependencies and coordinate joint releases

The good news here is that there’s no “one size fits all” approach to PI Planning, so think about how you could adopt the ideas and principles and make it work for your organization and context.

What is the difference between a PI Roadmap and a Solution Roadmap?

There are different types of roadmaps in SAFe, so it’s important to understand the differences and what each roadmap is meant to do.

PI Roadmap

A PI Roadmap is created before your PI Planning event and also reviewed and updated by Product Management after the event is finished. It will usually cover three Program Increments:

  1. The current increment (work that’s committed)
  2. The next forecasted increment (planned work based on forecasted objectives)
  3. The increment after that (further planned work based on forecasted objectives)

Quarterly PI Planning will outline around 9 months of work. The second and third increments on your PI Roadmap will likely change as priorities shift, but they’re still an important part of the roadmap as they forecast where the product is headed next.

Solution Roadmap

The Solution Roadmap is a longer-term forecasting and planning tool for a specific product or service.

It will usually cover a few years at a time, with more specific details available for year one (like quarterly features and capabilities), and more general information (like objectives) for year two and beyond.

What is a program?

A program is where agile teams are grouped together to form a larger group. This is often referred to as the “team-of-teams” level. In simple terms, a program is a group of agile teams.

When you hear people talking about “team-of-teams” or “scaled agile”, they mean taking agile beyond a single team, and asking more teams to join in.

For example, there might be 4 teams working on a NASA spaceship mission to Mars.

NASA decides they want to see if agile can help these teams do better work. So, to start with, the Oxygen team switches from working with traditional Waterfall project management methods to embracing agile principles.

  1. Launch team
  2. Food team
  3. Oxygen team (Agile)
  4. Landing team

After a few months, NASA decides that the way the oxygen team is working is going well, so the remaining three teams similarly adopt more agile methodologies:

  1. Launch team (Agile)
  2. Food team (Agile)
  3. Oxygen team (Agile)
  4. Landing team (Agile)

Each of these 4 teams are self-organizing, meaning they’re responsible for their own work.

However, now that these teams are all working in the same way, they can be grouped together as a program.

Once you add in the business owners, product management team, systems architect/engineer, and release train engineer, you have all the roles needed to continuously deliver systems or solutions through the Agile Release Train (ART).

What is a program board?

Program Boards are a key output of PI Planning.

Traditionally, they’re a physical board that’s mounted on the wall, with columns drawn up to mark the iterations for the increment, and a row for each team. Teams add sticky notes that describe features they’ll be working on.

  • Feature 1
  • Feature 2
  • Feature 3

Once all the features are added, they work to identify dependencies (features that’ll affect other features) and mark this up by connecting them with red string.

SAFe program boards don’t have to be physical, though. There are a lot of advantages to using a digital program board like Easy Agile Programs, which integrates directly with Jira. We’ll talk more about how you can use Jira for PI Planning towards the end of this guide.

Equip your remote, distributed or co-located teams for success with a digital tool for PI Planning.

Easy Agile Programs

Free Trial

Who is involved in PI Planning?

There are 5 key roles in a PI Planning event:

  1. Release Train Engineers
  2. Product Managers
  3. Product Owners
  4. Scrum Masters
  5. Developers

Here are the responsibilities for each of these roles during PI Planning:

Release Train Engineer

The Release Train Engineer is a servant leader and coach for the ART. Their role focuses mainly on planning and facilitating the PI Planning event. This means they help:

  • Establish and communicate the annual calendars
  • Get everything ready (including pre and post-PI Planning meetings)
  • Manage risks and dependencies
  • Create Program PI Objectives from Team PI Objectives and publish them
  • Track progress towards expected goals
  • Ensure strategy and execution alignment
  • Facilitate System Demos

As the facilitator for the 2-day event, the Release Train Engineer presents the planning process and expected outcomes for the event, plus facilitates the Management Review and Problem Solving session and retrospective.

Product Manager

A Product Manager’s job is to understand the customers’ needs and validate solutions, while understanding and supporting portfolio work.

Before PI Planning happens, Product Managers take part in the pre-PI Planning meeting, where they discuss and define inputs, objectives, and milestones for their next PI Planning events.

In PI Planning, the Product Managers present the Program vision and upcoming milestones. So that they can manage and prioritize the flow of work, they review the Draft plan and describe any changes to the planning and scope based on the Management Review & Problem Solving session. Once the PI Planning event is over, they use the Program Objectives from the Release Train Engineer to update the roadmap.

Following PI Planning, Product Managers play a critical role in communicating findings and creating Solution PI Objectives.

Product Owner

The Product Owners are responsible for maintaining and prioritizing the Team Backlog, as well as Iteration Planning. They have content authority to make decisions at the User Story level during PI Planning Team Breakout sessions.

Product Owners help the Team with defining stories, estimating, and sequencing, as well as drafting the Team’s PI Objectives and participating in the Team Confidence Vote. They’re also responsible for conveying visions and goals from upper management to the team, as well as:

  • Reporting on key performance metrics
  • Evaluating progress, and
  • Communicating the status to stakeholders

Scrum Master

The Scrum Master is a servant leader to the Product Owner and Development team, which means they manage and lead processes while helping the team in practical ways to get things done.

They facilitate preparation for events (including PI Planning) and prepare System Demos. They help the team estimate their capacity for Iterations, finalize Team PI Objectives, and manage the timebox, dependencies, and ambiguities during Team Breakout sessions. The Scrum Master also participates in the Confidence Vote to help the team reach a consensus.

Developer

Developers are responsible for researching, designing, implementing, testing, maintaining, and managing software systems.

During PI Planning, they participate in Breakout sessions to create and refine user stories and acceptance criteria (alongside their Product Owner) and adjust the working plan. Developers help to identify risks and dependencies and to support the team in drafting and finalizing Team PI Objectives, before participating in the Team Confidence Vote.

Do you have a key role in PI Planning? See how the right tool can help you manage your release train or program better.

Watch an Easy Agile Programs product demo

How to prepare for PI Planning

If you want to succeed at PI Planning, you need to prepare.

Every PI Planning event relies on good preparation so that your organization and attendees get the most out of the event and achieve your planning objectives.

The first step is to ensure that everyone involved properly understands the planning process. All people participating in PI Planning (along with key stakeholders and Business Owners) must be clear on their role and aligned on strategy.

Any presenters will also need to get content ready for their presentations.

To ensure that the PI Planning event runs smoothly, make sure that the tools you need to facilitate planning are available and working properly. Be sure to test any tech that you are relying on ahead of time (including audio, video, internet connectivity, and access to PI Planning applications), to ensure that your distributed teams can participate in the PI Planning event. Don’t forget to plan for enough food for everyone, too (planning is hungry work).

What happens after PI Planning?

After PI Planning, teams do a planning retrospective to discuss:

  • What went well
  • What went not-so-well
  • What could be better for next time
  • There will also be a discussion of what happens next, which can include things like:
  • Transcribing the objectives, user stories, and program board into your work management tool (like Jira)
  • Agreeing on meeting times and locations for daily stand-ups and iteration planning
  • Making sure that everyone has their belongings and leaves the event rooms clean when they go

The other thing that usually happens after PI Planning events is a post-PI Planning event.

What is a post-PI Planning event?

These are similar to the pre-PI Planning events we looked at earlier. A post-PI Planning event brings together stakeholders from all ARTs within the Solution Train to ensure they’re synchronized and aligned.

Post-PI Planning happens after all the ARTs have completed their PI Planning for the next increment. They present the plans, explain their objectives, and share milestones and expected timelines.

Like PI Planning events, post-PI Planning involves using a planning board, but rather than features, it outlines capabilities, dependencies, and milestones for each iteration and ART. Potential issues and risks are identified, discussed, and either owned, resolved, accepted, or mitigated. And similar to regular PI Planning events, plans go through a confidence vote to ensure they meet the solution’s objectives, and are reworked until the attendees average a vote of 3 or more.

Remote or hybrid PI Planning

PI Planning in person was once standard, but with teams more likely to be distributed, gathering everyone at the office isn't always feasible. This doesn't have to be a barrier.

The most important principle is to ensure that the teams who are doing the work are able to be 'present' in the planning in real-time, if not in person.

This may require some adjustments to the agenda and timing of your planning, but with forethought and support from the right technology, your PI Planning will still be effective.

Tips for remote PI Planning

Remote PI Planning is ideal for organizations with distributed teams or flexible work arrangements. It’s also a lot cheaper and less disruptive than flying folks in to do PI Planning every few months. If you have the right tools and technology, you can run PI Planning and allow everyone to participate, whether they’re in the same room or on the other side of the world.

Here are a few tips for remote PI Planning:

Embrace the cloud

Use online shared planning tools to allow your team to access and interact with information as soon as possible - ideally in real-time. Ensuring that all participants have instant access to the information simplifies the process of identifying dependencies and maintaining a centralized point of reference for your planning. This helps prevent errors that arise from working with different versions and transferring data between sources.

Livestream the event

Live-streaming audio and video from the PI Planning event is a viable alternative to in-person planning. Actively encourage your remote team members to use their cameras and microphones during the event. While it may not fully replicate the experience of having them physically present, it does come remarkably close.

Record the PI Planning event

Ideally, everyone will participate in the PI Planning live. But if your teams are distributed across multiple time zones or some team members are ill, it’s a good idea to record the event. Having a recording to refer back to could also be useful for attendees who want a refresher on anything that has been discussed.

Be ready to adapt

Some teams will change the standard PI Planning agenda to fit multiple time zones, which could mean starting the event earlier or later for some, or even running it across 3 days instead of 2.

Set expectations

A common issue that can arise from having distributed teams tune in remotely is too much noise and interference. Before your first session kicks off, communicate about when it’s acceptable to talk and when teams need to use the mute button. That way, your teams will avoid getting distracted, while still ensuring everyone can participate.

For more tips, check out our blog on how to prepare for distributed PI Planning.

Whether distributed or in person, if your team gets PI Planning right, it makes everything in the upcoming increment so much easier.

📣 Hear how PNI media have embraced virtual PI planning

Common PI Planning mistakes

PI Planning doesn’t always run smoothly, especially the first time. And the framework itself may present a challenge to some organizations. Here are some common mistakes and challenges to keep in mind (and avoid):

Long, boring sessions

Avoid starting your PI Planning event with long sessions filled with dense content. Think of creative ways to make these sessions more engaging, or break them into shorter sessions. Consider different formats that help to involve and engage participants. And be sure to make room for team planning and collaboration.

Tech issues

Any event is vulnerable to technical mishaps, but if you’re streaming audio and video to a distributed team, this can really impact the flow of the event. It’s a good idea to carefully test all the equipment and connections ahead of time to minimize potential problems.

Confidence vote

Some PI Planning participants struggle with the confidence vote concept. People may feel pressure from the room to vote for a plan to go ahead, rather than speaking up about their concerns. Failing to address issues early only increases the risk of something going wrong during the increment.

Time constraints

When you have a large ART of 10 or more teams, there are a lot of draft plans to present and review, so less time is allocated to each team. Chances are that the feedback will be of poorer quality than a smaller ART with 8 teams.

Not committing to the process

PI Planning isn’t perfect and neither is SAFe. However, the process has been proven to work for many organizations, when the organization is committed. Start with the full framework as recommended; you can adapt the framework and your PI Planning event to suit your organization, but be sure to commit to the process that follows. Anything that is half-done will not deliver full results.

Sticking with the same old tools

If something is not working, fix it. For example, too many teams stick with traditional SAFe Program Boards even though they’re not always practical. If the post-it notes keep escaping, the data entered into Jira seems incorrect, or you have a distributed team who want a digital way to be part of your PI Planning event… it’s time to upgrade to a digital program board like Easy Agile Programs.

Using Jira for PI Planning

Jira is the most popular project management tool for agile teams, so chances are you're already using it at the team level.

When you need to scale team agility as part of an ART, it can be difficult to properly visualize the work of multiple teams in Jira. The only way you can do that in the native app is by creating a multi-project board, which is rather clunky.

Traditional PI Planning on a physical board using sticky notes and string may achieve planning objectives for co-located teams, but what happens next? After the session is over, the notes and string need to be recreated in Jira for the whole team so that work can be tracked throughout the increment. This is a cumbersome and time-consuming process that is open to error as sticky notes are transcribed incorrectly, or go missing.

The best way to use Jira for PI Planning is to use an app like Easy Agile Programs to help you run your PI Planning sessions. The integrated features mean you can:

  • Set up a digital Program Board (no more string and sticky notes!)
  • Do cross-team planning
  • Visualize and manage cross-team dependencies, create milestones
  • Identify scheduling conflicts to mitigate risks
  • Get aligned on committed objectives for the Program Increment
  • Visualize an Increment Feature Roadmap
  • Conduct confidence voting
  • Transform Jira from a team-level tool to something that’s useful for the whole ART

Join companies like Bell, Cisco, and Deutsche Bahn who use Jira to do PI Planning with Easy Agile Programs (from the Atlassian Marketplace).

Looking for a PI Planning tool for Jira?

We’ll continue to revisit this guide in the future. If you have any questions about PI Planning or you notice there’s an aspect we haven’t covered yet, send us an email 📫

Easy Agile Programs
Scale planning and collaboration across teams

Related Articles

  • Product

    Rethinking our UI: How Easy Agile innovates for a better user experience

    At Easy Agile, we’re constantly looking for new ways to improve our products, and one of the ways we foster innovation is through Dash Days—a focused period where our team steps away from daily tasks to experiment, explore, and reimagine how our tools can better serve customers.

    During our most recent Dash Days, we took a fresh look at the user interface of two of our flagship products, Easy Agile TeamRhythym and Easy Agile Programs. The goal was to enhance interaction and discoverability, so users can experience the full value of our tools without unnecessary complexity.

    Here’s a glimpse into our thought process, challenges, and the exciting solutions we explored.

    The challenge

    As Easy Agile TeamRhythym and Easy Agile Programs have evolved, we’ve introduced powerful features designed to give users more control and flexibility. However, as new capabilities have been added, the interface has become more elaborate. For us, this presents an opportunity—an opportunity to take a step back, simplify the experience, and help users unlock more of what our products offer.

    To address this, we brought people from across the business together to brainstorm how we could improve the experience in both products. Through these sessions, we identified a few core opportunities:

    Key themes of opportunities to improve Easy Agile's user experience
    • Discoverability: How do we make it easier for users to find and use the powerful features built into our tools?
    • Visibility: What’s the best way to surface the right information and features when users need them? 
    • Consistency: How do we create a more uniform experience within and across our products to make navigation intuitive?

    Armed with these insights, we then set out to explore solutions tailored to each product’s unique challenges. 

    A more personalized experience with Easy Agile Programs

    For Programs, we focused on three “how might we” questions to reframe our challenges into opportunities: 

    1. How might we create more focus on the actions users are trying to complete?
    2. How might we make navigation more intuitive and easy?
    3. How might we help users with more context about where they are in the app at any given screen? 

    Out of the many solutions we explored, the one that got us the most excited was the idea of an Easy Agile Programs Home Screen—a personalized dashboard designed to guide users based on where they are in their planning cycle. 

    Conceptual sketch of a new home screen user interface for Easy Agile Programs
    Conceptual sketch of the Easy Agile Programs home screen

    This home screen could adapt based on where users are in their journey, offering relevant guidance and actions.

    • For new users, the home screen could provide clear onboarding steps and easy access to help, so they can get started quickly and confidently.
    • For experienced users, it could offer insights and key actions related to their progress, so they can stay focused on what matters most. Users might even see data summarizing their accomplishments, which makes it easier to share successes with their teams.

    Whether someone’s brand new to the product or deep into execution, the home screen could be a great way to guide and coach our users—helping them answer questions like, "What should I be doing next?" or "What extra value am I missing out on?". 

    A more focused interface for Easy Agile TeamRhythm

    For TeamRhythym, our three key “how might we” questions were:

    • How might we provide more focus within the User Story Map during sprint planning?
    • How might we improve the discoverability of issues without epics?
    • How might we enhance the layout to highlight key features and improve overall usability? 

    With these questions in mind, we explored a range of ideas to simplify sprint planning and make it easier for users to prep, plan, and review their work, whether they’re using Scrum or Kanban.

    Three-step process for effective sprint planning on Easy Agile TeamRhythm
    Three steps to simplify sprint planning on Easy Agile TeamRhythm

    Sprint planning can sometimes feel overwhelming when you have multiple sprints competing for attention. To help users focus, so we explored the idea of introducing a focused view during sprint planning

    • This would allow users to zoom in on a specific sprint and the backlog alone, while collapsing others. 
    • Each issue would have its own row in the detailed view, and users can drag and drop either an entire row or drag individual issues to quickly rank them based on priorities.
    • The sprint view will also hide epics that don’t have linked issues in the current sprint, giving users a cleaner view of what’s relevant to their current work.
    Conceptual UI of Easy Agile TeamRhythm User Story Map's focused view for sprint planning
    Conceptual UI of TeamRhythm User Story Map's focused view for sprint planning
    Conceptual UI of Easy Agile TeamRhythm User Story Map's detailed sprint view
    Conceptual UI of TeamRhythm User Story Map's detailed sprint view

    We also looked at ways to enhance the User Story Map interface to bring the most useful tools and features to the forefront. By improving how key functionality is presented, we’re helping teams quickly access what they need, when they need it, enabling them to stay productive without interruption.

    Conceptual UI of a more condensed top navigation for TeamRhythm User Story Map
    Conceptual UI of a more condensed top navigation for TeamRhythm User Story Map

    This way, we can create a smoother, more focused experience for teams using TeamRhythm, so they can focus on what’s in front of them without being distracted by everything else.

    Your turn. What do you think?

    At Easy Agile, we’re always thinking about what comes next. 

    These ideas aren’t on our official roadmap just yet, but they’re the kind of innovations we’re excited to explore.

    If you think these changes would improve your experience with Easy Agile TeamRhythm and Easy Agile Programs, let us know! Your feedback helps us decide what to prioritize, so we can continue building tools that truly make a difference for your teams.

    Photos of Easy Agile team working on Dash Days with "thank you!" on it

  • Workflow

    How to set your Agile teams up for success

    Agile is about empowering teams to take ownership, feel truly engaged, and foster a culture of collaboration. More than ever, teams are required to deliver with greater adaptability, speed, and engagement. The future is more ambiguous and complex, and Agile teams must know how best to respond to these changing conditions.

    Agile experts John Walpole, Dean MacNeil, and Nick Muldoon share their success formula behind the high-functioning Agile teams at Lyft, Valiantys, and Easy Agile. You will learn:

    Setting your Agile team up for success

    WATCH NOW

    Create a compelling 'why' that the whole team can get behind

    I think Agile is not a silver bullet. We have people who look at Agile and say, "Oh, well, this is going to solve all of our woes." And it's not; it's certainly not a turnkey thing.

    Nick Muldoon, Co-CEO at Easy Agile

    Agile is not a silver bullet. It is not a methodology that will solve leaders, teams and individuals' problems. Agile is a continuous improvement journey of "adaptability in evolutionary theory; it's about responding to either a new environment or changes in your environment to again, not just survive but to thrive," said Dean.

    Set your Agile teams up for success by teaching them to thrive by empowering them to lead change, make mistakes, build a solid foundation, and be open to learning, changing, and communicating the meaningful 'why' behind their work. You will see an explosion in Agile team success when you have a "cohesive team aligned to a common mission with a growth mindset."

    Motivate your Agile teams by connecting their work with a meaningful 'why.' Schedule a meeting to ensure you constantly discuss their work's more profound purpose. Bring up a real-life customer example. John shared, "At Lyft, we share stories in a fortnightly meeting. We offer free accessible rides to those in wheelchairs or those who struggle to pay for a ride but need access to transportation to get to work or school.

    "Bring your personas to life with these real-life examples, so it's front and center in your employee's minds," said John.

    Empowering your teams

    Culture eats strategy for breakfast

    Peter Drucker

    Your employees need to lead the change. "If you look at great leaders in recent Agile transformations, you might want to look at a company like Porsche," said Dean. Dean shares how Porsche has inspired Valiantys because "every employee at Porsche is leading the change. So they're all bought into it; they all have that sense of leadership to drive it.". Porsche's employees are leading the change because their leadership communicates the 'why' well. "Fun is number one when their CIO lists off the top three reasons 'why' everyone is so fired up about the Agile transformation. Because you can have fun on the job, your job is not supposed to be a grim duty. It's supposed to be something you look forward to."

    "Empower your teams to make mistakes," said John.

    Empower your Agile teams to fail and make mistakes through powerful questions. Leaders have to change their tone from "oh no, who do I fire?" to "what's the challenge? What can I do to help?". Express to your team that you're on a journey to learn as much as they are. In doing so, the leader humanizes themselves and becomes more vulnerable.

    Leadership sets the tone. As a company scales, the responsibility to create the culture and the risk appetite falls more on leadership.

    Qualities of high-performing, Agile teams

    1. Create a solid foundation

    Set your Agile team up for success with a stable team unit. Don't keep moving teams around; create long-term Agile teams to allow individuals to get to know each other and humanize one another. "I think stability is key to having the tacit knowledge keeping together and this open mindset where they're willing to learn; I love that," said Nick.

    2. Open to learning and adapting

    For Agile teams to continuously improve, they must constantly be learning and adapting. "You can't get that learning and adaptation if you keep just stirring the pot. Because you're going to keep scattering that knowledge, you want to take hold, and then, of course, you want to spread the knowledge to the organization then," said Dean.

    3. Share feedback and do the retrospective

    Ensure your Agile teams are demonstrating working product on a regular occurrence. If you're practicing Scrum, make sure you are doing the weekly sprint review. This allows the team to receive feedback from stakeholders and keep iterating and moving forward, ensuring they stay in movement. "Do your retrospective," said Dean." We're looking at what we delivered, and now we're going to look at how we delivered it." It is imperative that Scrum teams gather at the end of each sprint to discuss what went well, what didn’t go so well, and what can be improved on for next time. Otherwise, you invite complacency and stagnation into your Scrum process — the antithesis of Agile.

    Using Easy Agile to set your Agile teams up for success

    Easy Agile TeamRhythm supports your team's Agile practices in Jira. The user story map format in TeamRhythm transforms your flat product maps into a dynamic and flexible visual representation of work. Watch the highlights tour to see how Easy Agile TeamRhythm makes sprint planning, managing your backlog, and team retrospectives easier. Visit Atlassian Marketplace to start your free, 30-day trial today.

  • Agile Best Practice

    Six Tips for Improving Team Collaboration

    The 17th State of Agile Report shared that 93% of executives thought that their teams could do the same amount of work in half the time, if their teams collaborated better.

    That's quite a statistic. We’ll leave it up to you to decide whether this reflects a lack of efficiency due to poor collaboration, or a disconnect between leadership expectations and the realities faced by development teams.

    What we do know is that improving team collaboration has benefits and that improved collaboration is a key benefit of effective agile practices.

    So if you think your team could work more effectively, here are six tips for improving team collaboration that we think will make your working life better, and help you deliver for your customers.

    1. Agile Teams Are Cross-Functional

    Cross-functional teams are the backbone of agile collaboration. It's Agile 101:

    The best architectures, requirements, and designs emerge from self-organizing teams.

    Manifesto for Agile Software Development

    Ideally, your agile team should be able to deliver work independently. The skills and expertise of your team should allow you to handle diverse tasks without creating dependencies on other teams. You can take ownership of the software you're delivering.

    The benefit of organizing into cross-functional teams is a greater shared understanding of your project, where you can each see how the pieces fit together. This type of collaboration supports the efficient flow of work and ensures that knowledge and skills are consistently shared.

    2. Take an Iterative Approach

    Or to put it another way, make it easier to fail fast, so your team can learn why, and correct your course. By breaking down large projects into manageable increments, your team can focus on delivering small, functional parts of working software at regular intervals. This approach goes hand-in-hand with continual feedback from users, ensuring that issues are uncovered quickly and dealt with just as fast. This shared team focus on user feedback, and the shared purpose and collaboration that comes with it, is a key benefit of agile development.

    3. Maintain Regular and Transparent Communication

    Daily stand-ups, sprint reviews, and planning meetings are all designed to foster regular and clear communication. You and your team should see these meetings as an opportunity to share ideas, discuss progress and blockers, and collaborate. If your daily stand-up is nothing more than a shopping list of tasks, then you're doing it wrong.

    If your daily stand-up is nothing more than a shopping list of tasks, then you're doing it wrong.

    Someone who has wasted too much time in shopping-list meetings.

    Beyond team meetings, clear communication is important anywhere the details of your work are shared. Agile tools like Easy Agile TeamRhythm provide a central platform for prioritizing work and tracking progress. With a central source of truth that everyone can access to understand goals, priorities, and team commitment, collaboration can be more effective, keeping the team aligned and focused.

    4. Conduct Team Retrospectives

    Hot take: regular retrospectives are the most important agile practice your team can adopt.

    Team retrospectives provide a structured opportunity to reflect on your work and discuss how it can be done better next time. This is team-led improvement because you and your team are in the driver's seat. Encouraging honest and open discussions during retrospectives helps build trust among team members and fosters a collaborative mindset. By continuing to work on processes and behaviors, you and your team can improve your performance over time and make your working life better.

    5. Use Collaboration Tools

    The right tools can make a big difference in team collaboration. The best tools provide a reliable source of truth that the whole team can access, in a place where the whole team will access it. It's a simple concept; a shared understanding of the work is supported by shared and willing access to the same information.

    Choose a tool that makes it easy for you and your team to access information and keep it updated. If you're already working in Jira, an integration like Easy Agile TeamRhythm provides a better view of your work in a story map format, with goals, objectives, and team commitment all made clear. Team retrospective boards are attached to each sprint (or spun up as required for Kanban teams) so you have your team-led ideas for improvement tightly connected to the work in Jira.

    No matter which tool you choose, make sure it will facilitate better alignment, streamline your workflows, and provide a clear picture of roadblocks and progress. By using collaboration tools effectively, your team stays organized, focused, and connected, no matter where each member is located.

    6. Build a Positive Team Culture

    It may sound obvious, but a positive team culture is essential for effective collaboration. Creating an environment where team members feel valued, respected, and motivated, encourages the psychological safety they need to share their great ideas, learn from missteps, and collaborate more effectively with their colleagues.

    High-performing teams recognize the achievements of others, share constructive feedback, and support practices that lead to a healthy work-life balance. Make it regular, and keep it authentic. A positive culture not only improves team dynamics but also boosts overall productivity and job satisfaction.

    Successful Team Collaboration

    Effective collaboration can be the difference between your team achieving their goals, or falling short. By embracing agile practices like the regular communication that comes from agile planning meetings, to the learnings that come from taking an interactive approach to development, and creating time for team-led improvement with retrospectives, you can seriously boost your team dynamics.

    Easy Agile TeamRhythm Supports Team Collaboration

    Easy Agile TeamRhythm is designed to make your agile practices more accessible and effective, helping your team plan, prioritize, and deliver work with better alignment and clarity.

    Built around a story map for visualizing work and retrospective boards that encourage team-led improvement, TeamRhythm facilitates sprint and release planning, dependency management, backlog management, user story mapping, and retrospectives.

    Tight integration with Jira makes Easy Agile TeamRhythm a reliable source of truth, no matter where you and your team members are located.

    Watch a demo, learn about pricing, and try for yourself in our sandbox. Visit the Easy Agile TeamRhythm Features and Pricing page for more.

    Easy Agile TeamRhythm